
The interventions to be financed for the construction of photovoltaic systems to be installed on buildings for productive use in the agricultural, livestock and agro-industrial sectors have been published in the Official Gazette.
Important points to know:
- photovoltaic systems are eligible for aid only if the objective is to satisfy the company's energy needs;
- it is intended to select and finance projects that provide for the purchase and installation of photovoltaic panels on the roofs of buildings instrumental to the activity of the beneficiaries, including those intended for reception and hospitality in the context of the agritourism activity;
- removal and disposal of asbestos (or, where applicable, of eternity);
- 40 per cent of the resources are destined to finance projects to be carried out in the regions of Abruzzo, Basilicata, Calabria, Campania, Molise, Puglia, Sardinia and Sicily;
- Beneficiaries are:
- Agricultural entrepreneurs, individually or as a company;
- agro-industrial enterprises;
- agricultural cooperatives.
- The interventions eligible for the subsidy to be implemented must have a peak power of no less than 6 kWp and no more than 500 kWp;
- Eligible expenses:
- for the construction of photovoltaic systems: purchase and installation of photovoltaic modules, inverters, management software, additional system components;
- storage systems;
- supply and installation of the materials necessary for the implementation of the interventions;
- network connection costs;
- up to a maximum limit of Euro 1,500.00 / kWp for the installation of photovoltaic panels, also in consideration of the overall size of the system to be built and the related economies of scale, and up to a further Euro 1,000.00 / kWh where they are accumulation systems are also installed. In any case, the total contribution paid for the storage systems cannot exceed € 50,000.00. If electric charging stations are installed for sustainable mobility and agricultural machinery, an expense up to a maximum admissible limit of Euro 1,000.00 / Kw per column may be recognized, in addition to the ceilings indicated above.